Источник данных о погоде: Минск погода на 7 дней
Технологии
kvb.by

Мы находимся:

Беларусь, Минск

Связь с редакцией. Email:

883388a@gmail.com

Creating projects for the fleet

Adrenaline Дата публикации: 31-05-2023 16:34:00 Просмотров: 1007

Creating projects for the fleet
Фото: kvb.by, фото может носить иллюстрационный характер, Creating projects for the fleet

During the construction, modernization or need to modify a vessel supervised as RRR or RMRS, it is necessary to prepare a project, which then must be approved.

Specialized companies, in particular

It will take only 1-2 days to develop technical documentation. Then it will also be necessary to wait for approval from the Classification Societies, which takes 1-4 weeks. As a result, you get a comprehensive solution - the creation and approval of design documentation before putting the equipment into operation and installing it.

See also: ☭  NATO shocked by the ability of the Russian army to camouflage

When creating a project, companies usually adhere to a number of principles, which is very important. This is an integrated approach to the design process, during which the wishes of the client, the features of the vessel are carefully studied. Some individual wishes of customers are additionally studied and, on this basis, probable ways of solving them are developed. Companies usually have a flexible approach to the choice of equipment, taking into account the functional features of the vessel and equipment.

Design and estimate documentation is created as a complete set, while the requirements of classification communities, regulatory requirements and current documents are necessarily taken into account.


Предлагаем посмотреть другие страницы сайта:
← NATO is shocked by the Russian army's camouflage capabilities | Veteran of the Black Sea Fleet BDK Saratov →


# ОСТАВИТЬ КОММЕНТАРИЙ:

Добавить комментарий


Будьте вежливы друг к другу и осторожней в своих высказываниях! Все комментарии проходят модерацию!
Как ў Беларуcі

# ПОДЕЛИТЬСЯ: